问题: 请帮我一下好吗
由于本工程施工场地狭窄,且为了更好地保证钢结构的制作质量,我公司决定所有构件均在公司基地制作,形成工厂化制作,待钢构件制作完成后运往现场进行安装。
解答:
Due to limited space available at the site and for better quality assurance in the production of steel components, it has been decided to fabricate steel structure at the company's premises under strict quality control condition. Completed units are to be transported to site for assembling and installation process.